DIGITAL
MANOMETER
(P/N PK0036)
PRESSURE ADJUSTMENT SCREW
DECREASE
PRESSURE
INCREASE
PRESSURE
FLAME
SHIELD
DIAPHRAGM
COMPRESSOR
IGNITION
ELECTRODE
ASSEMBLY
Figure 4-9: Air Pressure Test. Diaphragm Compressor Model.
MODEL AIR PRESSURE (DIAPHRAGM COMPRESSOR)
M50 6.0 ± 0.1 PSI (41.4 ± 0.7 kPa)
M80/M90 2.9 ± 0.1 PSI (20.0 ± 0.7 kPa)
M105/M125 3.65 ± 0.1 PSI (25.1 ± 0.7 kPa)
Test Procedure Air Compressor pressure (Diaphragm Compressor models):
Ensure fuel nozzle is clean (see page 4-7) and the air compressor filter is clean
(see page 4-9) before proceeding with air compressor pressure check.
h
) Remove the plug to the air pressure measurement port.
i
) Thread in the Pressure Gauge and torque to 25 in-lbs ±3 in-lbs (2.8 Nm
±0.3 Nm) as shown in Figure 4-9.
j
) Connect Power Harness and Remote Switch to the G-II PCM.
k) Switch the PROHEAT on and observe the air pressure:
l) Adjust the air pressure if necessary by turning the screw as shown in
Figure 4-9.
If the pressure cannot be set to the correct setting, rebuild kits are available.
See www.proheat.com for the latest parts manual SL9151 for more information.
m) Turn heater off. Wait until Cool Down (Purge) mode is complete
(approximately 3 minutes).
n) Remove Pressure Gauge. Lubricate air measurement port plug o-ring with
diesel fuel and reinstall plug into fuel block. Torque to 25 in-lbs ±3 in-lbs
(2.8 Nm ±0.3 Nm). Reconnect the Ignition Module and Fuel Solenoid
connectors to the G-II PCM. Re-install the Flame Shield, the Ignition
Electrode Assembly and Burner Head onto the Heat Exchanger.
WARNING
Connect power and switch only. DO
NOT connect the temperature sensor.
4-10
PROHEAT M-SERIES G-II PCM SERVICE MANUAL
PRESSURE
ADJUSTMENT
SCREW
Vue de la page 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 89 90

Commentaires sur ces manuels

Pas de commentaire